How to change: Power supply
This is the guide on how to change the power supply on your ROEST.
Where to buy power supply?
If you are sure your power supply is broken (you have talked to our Support Team) visit our e-shop to purchase a new one!
Before you start
⚠️DISCLAIMER
Information in this document is believed to be accurate and reliable. However, the manufacturer does not give any representations or warranties, expressed or implied, as to the accuracy or completeness of such information and shall have no liability for the consequences of the use of such information. The manufacturer is not liable or responsible for any problems arising from the attempted repair. The manufacturer reserves the right to make changes to information published in this document, including without limitation specifications and product descriptions, at any time and without notice. The manufacturer's products are not designed, authorized, or warranted to be suitable for use in applications where failure or malfunction can reasonably be expected to result in personal injury, death, or severe property or environmental damage. The manufacturer accepts no liability for inclusion and/or use of its products in such equipment or applications and therefore such inclusion and/or use is for the customer’s own risk.
⚠️SAFETY INSTRUCTIONS
make sure the roaster is turned off
the power cord has to be unplugged
follow the steps as instructed below
Tools
Padded mat
Parts
4. Take a reference picture of the location of the cables prior to removing them.
5. Remove the 5 horse-shoe cables from the power supply.
6. Place the padded mat on the desk and lay the roaster down on its side, ensuring that the mat protects the right-side panel (which remains installed).
7. Using a 2.5-millimeter hexagonal key, remove the three cap head bolts on the roaster’s base.
8. Remove the power supply from the roaster.
9. Insert the new power supply and align the holes to screw the three bolts on the base.
10. Position the roaster back up.
11. Reattach the five cables into the power pack using the image taken in step 4.
12. Reattach the exhaust tube.
13. Install the left side panel.
15. Plug the roaster in, turn it on and test it. If it doesn’t work, contact the ROEST support team.
-
Adjustable roasting parameters
Service menu - includes recommended settings for motor gear ratio, cooling fan, heater fan, and PID settings.
-